RockySea Petro 3NB Series Mud PumpData sheetFunction1. Remove rock debris from the bottom of the well and send it back to the surface;2. Handle complex underground situations. When encountering fractured formations, pump in plugging materials, and when encountering stuck drilling, pump in crude oil and diesel to release the stuck.3. Make mud cakes on the wellbore to prevent collapse;4. Balance or control the pressure of oil, gas, and water layers in the drilled well section to prevent blowout;5
VIEW DETAILSRockySea Petro Heavy Oil Recovery Sucker Rod PumpRockySea Petro is the professional heavy oil recovery downhole pump Manufacturers.20 years of manufacturing experience in International Standard Insert Pump.40 years’ experience in designing and manufacturing downhole pumps.Participated in the draw up of the national standard of sucker rod pump.RockySea Petro Petro 40 years’ experience in designing and manufacturing sucker rod pumps.Your Premier Heavy Oil Recovery Sucker Rod Pump Manufacturers And Supplier
VIEW DETAILSRockySea Petro Downhole Pump FittingsWe establishes cooperative relationships with international customers such as Shell, GE, Schlumberger, and JOHN CRANE.Exported to the United States, Europe, Asia and Asia,The standard parts of the sucker rod pump produced by our company are well-selected, precision-made, stable in quality and excellent in performance, .Your Premier Downhole Pump Fittings Manufacturers And Suppliers.Valve Rods Valve rod materials include steel, alloy steel, stainless steel and bra
VIEW DETAILSRockySea Petro Electromagnetic Diaphragm Metering PumpFeatureThe Electromagnetic diaphragm metering pump of RockySea Petro has the following advantages.1. The flow can be adjusted by manually adjusting the stroke to change the flow and adjusting the stroke frequency.2. It is easy to install and equipped with filter bottom valve, injection valve and inlet and outlet hoses.3. The pump head and flow passage parts made of corresponding materials shall be configured according to the corrosion performance r
VIEW DETAILSRockySea Petro Drilling JarApplicationRockySea Petro can provide three main types drilling jar: mechanical, hydraulic, and hydraulic.1. The combination of mechanical and hydraulic drilling jar absorbers combines the advantages of the above two shock absorber principles. Even if the hydraulic delayed shock absorber fails, the mechanical shock absorber can still be used, and the technical performance has been greatly improved, which is in line with the future development direction of shock absorber prod
VIEW DETAILSRockySea Petro Gas Recovery Wellhead And X-Mas Tree
Working pressure (PSI) | 2000, 3000, 5000, 10000,15000,20000 |
Nominal diameter (inch) | 2-9/16、3-1/16、3-1/8、4-1/16 |
Working temperature ℃ | LU (-46℃-121℃) |
Working media | Gas |
Material class | BB/CC/DD/EE/FF |
Specification level | PSL2, PSL3/3G,PSL4 |
Performance level | PR1 PR2 |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP