RockySea Petro RM Pumping UnitUsing AutoCAD, Solid Works computer software to design drawings, using virtual prototype technology to simulate and verify strength.RockySea Petro adopt the principle of combining International Standard, National Standard and User’s view to design.RockySea Petro has passed ISO9001, SO14001 and OHSAS18001 certificate.RM pumping unit is designed on the basis of conventional beam pumping unit, which can change the time of up and down stroke of the pumping unit and is suitable for heav
VIEW DETAILSRockySea Petro Sucker Rod Guide CentralizerIn oilfield operation, pumping jack and PCP(Progressive Cavity Pumping) systems increase operational costs associated with rod&tubing friction and paraffin deposition in production tubing. RockySea Petro has developed a series of rod guides which are also called rod centralizer that are molded directly onto the rod body to control this threat. Our rod guides for pumping jack and PCP applications come in a wide range of materials and are specifically designed to me
VIEW DETAILSRockySea Petro Cement HeadData sheetAdvantageRockySea Petro has extensive experience in manufacturing Cementing head, and our products have the following advantages.1. The main body is made of thick walled seamless pipes, which are high-pressure resistant and have a long service life.2. Equipped with quick fitting joints, it is easy to connect on site and can be connected to API long round buckles/short round buckles/trapezoidal buckles, with a wide range of applications.3. The dual indicator structur
VIEW DETAILSRockySea Petro Kelly BarRockySea Petro has abundant experience in R & D, production and sales of Kelly bars. The Kelly bar is located at the top of the drill string, and its main function is to transmit torque and bear the total amount of the drill string. The end face of the driving part of Kelly is divided into square and regular hexagon, which are most used in oil drilling Kelly is about three times thicker than drill pipe and made of high strength alloy steel, so it has high tensile strength and t
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILS
Rated working pressure(psi) | 3000,5000,10000,15000,20000 |
Valve Nominal diameter(in) | 2-1/16,2-9/16,3-1/16,3 -1/8, 4-1/16,5-1/8,7-1/16 |
Production specification level | PSL1 PSL2 PSL3 PSL3G PSL4 |
Performance rate | PR1 PR2 |
Material class | AA BB CC DD EE FF HH |
Connection type | Thread, flange |
RockySea Petro Copyright © 2008-2024 Inc. SITEMAP