RockySea Petro 3NB Series Mud PumpData sheetFunction1. Remove rock debris from the bottom of the well and send it back to the surface;2. Handle complex underground situations. When encountering fractured formations, pump in plugging materials, and when encountering stuck drilling, pump in crude oil and diesel to release the stuck.3. Make mud cakes on the wellbore to prevent collapse;4. Balance or control the pressure of oil, gas, and water layers in the drilled well section to prevent blowout;5
VIEW DETAILSRockySea Petro Water Injection Wellhead And Christmas TreeAccording to casing and well condition, Water Injection Wells can be divided into large casing well, normal well and small diameter well.According to the pipe string structure Water Injection Wells can be divided into support type and suspension type.According to their functions, water Injection wells are divided into stratified injection Wells and general injection wells.In the process of oilfield development, special water injection Wells a
VIEW DETAILSRockySea Petro Single Column Dual-Well Thermal Recovery WellheadRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s ther
VIEW DETAILSRockySea Petro PR2 Gate ValveFull support on your customised requirementThe strictest quality standards on PR2 gate valve25 years PR2 gate valve manufacturing experiencePR2 gate valves are designed for high performance wellheads and christmas tree in Oil or gas recovery wells, especially the gas wells that containing H2S or CO2 in high volume.Description The RockySea Petro PR2 valve is designed to suit severe oilfield conditions. It is mainly used in oil/gas wells with high performance requirements. S
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILS
Model | Tapered Annular Blowout Preventer |
Standard | International Standard |
Nominal diameter(in) | 7 1/16 to 13 5/8 |
Rated working pressure(psi) | 5000 to 15000 |
Processing type | Forging |
Material | AA to EE and optional |
Metal temperature class | -29~121℃ |
Nonmetal temp. class | -18~121℃ |
Ring gasket | R45 or optional |
Dimension and Weight | Based on specific type |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP