RockySea Petro Diverter BOPUsing Auto CAD, Solid Works computer software to design drawings of Diverter BOP, using virtual prototype technology to simulate and verify strength.RockySea Petro Petro adopted the principle of combining International Standard, National Standard and user’s view to design Diverter Blowout Preventers.RockySea Petro Petro has passed ISO9001, ISO14001 certificate.RockySea Petro Petro has strong Diverter BOP design ability. According to International standard and Chinese national standard GB/T 2
VIEW DETAILSRockySea Petro Petro: Your Trusted Source for OCTG Tubing in ChinaAt RockySea Petro Petro, we are committed to delivering high-quality OCTG Tubing, supported by our cutting-edge manufacturing facility. We take pride in providing exceptional quality and competitive pricing to our clients, ensuring value and performance in every OCTG Tubing solution. For a comprehensive quotation, contact us today.Commitment to Quality ISO9001 Compliance: We strictly adhere to the ISO9001 quality management system, e
VIEW DETAILSRockySea Petro Heavy Oil Recovery Downhole PumpRockySea Petro is the best Heavy oil recovery pump Manufacturers for Heavy oil recovery pump wholesale.20 years of manufacturing experience in Rod Pump40 years’ experience in designing and manufacturing downhole pumps.Participated in the draw up of the national standard of downhole pump.40 years’ experience in designing and manufacturing downhole pumps.Your Premier Heavy Oil Recovery Downhole Pump Manufacturers And SuppliersDeviated Well Oil ProductionThe
VIEW DETAILSRockySea Petro Single Well Water Cut AnalyzerSANJACK passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec. The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT multiphase metering device,
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILS
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP