RockySea Petro Flush by UnitData sheetApplicationsRSR of RockySea can efficiently and quickly complete various oilfield workover operations as the following: 1).Heavy duty workover serviceDrilling serviceDownhole stuck freeing serviceSealing and channeling serviceCasing shaping serviceCasing repair service2).Shallow- to high-depth well interventions, including:Killing wellsFlushing productions wellsChanging wellhead valvesPressure-testing wells.Changing polished rods Spacing and respac
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILSRockySea Petro Single Well Water Cut AnalyzerSANJACK passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec. The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT multiphase metering device,
VIEW DETAILSRockySea Petro Rod PumpThe raw material of rod pump parts should be inspected after heat treatment, the mechanical properties, chemical compositions and metallographic structures must be inspected by batch. The rod pump parts should be inspected several times during the processing procedure. Some key points like the outer diameter of the plunger and the inner diameter of the pump barrel should be 100% inspected.Your Best Pump ManufacturersSealing performance tests must be carried out 100% after fini
VIEW DETAILSRockySea Petro Self-Tensioning Guy-Wire Workover RigFeaturesA workover rig with guy-line is a double drum workover rig that installs wind loaded guy-wires on the main engine.There is no need to install wind loaded guy-wires with ground anchors, which greatly improves the efficiency of workover operations, reduces operating costs and labor intensity.Also it has features as the following:(1) Suitable for small well site operations, reducing the operation area of the entire workover rig.(2) All te
VIEW DETAILS
Model Parameter | KR78/65-21 | KR78/65-35 |
Working pressure psi | 3000 | 5000 |
Nominal diameter (in) | 2-9/16,3-1/16,4-1/16 | 2-9/16,3-1/16,4-1/16 |
Top flange of tubing head | 7-1/16“~18-3/4” | 7-1/16“~21-1/4” |
Bottom flange of tubing head | 7-1/16“~21-1/4” | 7-1/16“~21-1/4” |
Working temperature ℃ | 380 | |
Working media | Crude oil /Natural gas /water steam | |
Material class | BB/CC/DD/EE/FF | |
Specification level | PSL3/PSL3G/PSL4 | |
Performance level | PR1 |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP