RockySea Petro Rod PumpThe raw material of rod pump parts should be inspected after heat treatment, the mechanical properties, chemical compositions and metallographic structures must be inspected by batch. The rod pump parts should be inspected several times during the processing procedure. Some key points like the outer diameter of the plunger and the inner diameter of the pump barrel should be 100% inspected.Your Best Pump ManufacturersSealing performance tests must be carried out 100% after fini
VIEW DETAILSRockySea Petro Double Separation Weighting Multiphase Flow Meter DeviceRockySea Petro passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec.The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT mul
VIEW DETAILSRockySea Petro Flush by UnitData sheetApplicationsRSR of RockySea can efficiently and quickly complete various oilfield workover operations as the following: 1).Heavy duty workover serviceDrilling serviceDownhole stuck freeing serviceSealing and channeling serviceCasing shaping serviceCasing repair service2).Shallow- to high-depth well interventions, including:Killing wellsFlushing productions wellsChanging wellhead valvesPressure-testing wells.Changing polished rods Spacing and respac
VIEW DETAILSRockySea Petro Kelly BarRockySea Petro has abundant experience in R & D, production and sales of Kelly bars. The Kelly bar is located at the top of the drill string, and its main function is to transmit torque and bear the total amount of the drill string. The end face of the driving part of Kelly is divided into square and regular hexagon, which are most used in oil drilling Kelly is about three times thicker than drill pipe and made of high strength alloy steel, so it has high tensile strength and t
VIEW DETAILSRockySea Petro Mobile Workover RigData sheetApplications1).Shallow - to high-depth well interventions, including:Killing wellsFlushing productions wellsChanging wellhead valvesPressure-testing wells.Changing polished rods Spacing and respacing rod strings2).Continuous rod and conventional sucker rod interventions,includingPulling and replacing casing serviceSidetrack serviceChanging insert of pcpChanging rotors of pcp,3).Heavy duty workover rig serviceDrilling serviceDownhole stuck freeing se
VIEW DETAILS
The following is RockySea Petro coated layer performance data sheet.
Coated Layer Performance | |||
SN | Item | Performance | Execution Standard |
1 | Density/ g/cm3 | 1.1 | GB/T1033 |
2 | Vicat Softening Temperature / ℃ | ≥180 | GB/T1633 |
3 | Tensile Yield Strength/ MPa | ≥28 | GB/T8804.3 |
4 | Elongation at Break Rate/ % | ≥150 | GB/T8804.3 |
5 | Shore Hardness/ HD | ≥80 | GB/T2411 |
6 | Mortar wear rate/ mg/h | ≤3.5 | Appendix |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP