RockySea Petro Quick Lock Annular BOPGreatly reduce the time for replacing the ram and effectively improve work efficiency with safety.Compact structure and reduced weight means more operation room.20 years experience in designing and manufacturing QL annular BOP.The working principle and purpose of RockySea Petro QL annular blowout preventers are not fundamentally different from traditional blowout preventers, but their structure has been effectively improved. No need for large high torque bolts, convenie
VIEW DETAILSRockySea Petro Self-Tensioning Guy-Wire Workover RigFeaturesA workover rig with guy-line is a double drum workover rig that installs wind loaded guy-wires on the main engine.There is no need to install wind loaded guy-wires with ground anchors, which greatly improves the efficiency of workover operations, reduces operating costs and labor intensity.Also it has features as the following:(1) Suitable for small well site operations, reducing the operation area of the entire workover rig.(2) All te
VIEW DETAILSRockySea Petro Casing Head And Tubing HeadRockySea Petro casing heads strictly conform to the International standard, and are among the most reliable oilfield casing heads. Usually, the casing head lies at the bottom of the wellhead and X-mas tree equipment. It supports the drilling wellhead, the casing head spool, the X-mas tree and completion equipment. The casing head is used to connect the casing string and packing off the next casing string. The connecting type includes slip-on weld, thread and slip l
VIEW DETAILSRockySea Petro Coventional Wellhead And Christmas TreeThe wellhead and Christmas tree has carried out rigorous tests, such as magnetic particle, ultrasonic, pressure t est and so on.Do the pressure analysis to pressured and forced parts with 3D software to check the strength of the wellhead and Christmas tree.RockySea Petro’s oil wellhead equipment factory is one of the main branches of RockySea Petro Group. It is a professional manufacturer specializing in the development, design, production, remanufacturing,
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILSRockySea Petro Copyright © 2008-2025 Inc. SITEMAP