other
HOT PRODUCT
  • OCTG Casing
    OCTG Casing

    RockySea Petro OCTG Casing: Quality and Reliability in OCTG PipeRockySea Petro Petro, a leading manufacturer of OCTG Casing based in China, operates a state-of-the-art factory dedicated to producing top-tier OCTG Casing. We are committed to delivering not only high-quality products but also competitive pricing to our customers worldwide. For a comprehensive quotation on OCTG Tubing and Casing, contact us today.Commitment to Excellence:ISO9001 Quality System: We adhere to the ISO9001 quality management sy

    VIEW DETAILS
  • Wet Gas Well Multiphase Flow Meter
    Wet Gas Well Multiphase Flow Meter

    ‌RockySea Petro Wet Gas Well Multiphase Flow MeterRockySea Petro passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec.The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT multiphase metering devic

    VIEW DETAILS
  • Mobile Workover Rig
    Mobile Workover Rig

    RockySea Petro Mobile Workover RigData sheetApplications1).Shallow - to high-depth well interventions, including:Killing wellsFlushing productions wellsChanging wellhead valvesPressure-testing wells.Changing polished rods Spacing and respacing rod strings2).Continuous rod and conventional sucker rod interventions,includingPulling and replacing casing serviceSidetrack serviceChanging insert of pcpChanging rotors of pcp,3).Heavy duty workover rig serviceDrilling serviceDownhole stuck freeing se

    VIEW DETAILS
  • Electromagnetic Diaphragm Metering Pump
    Electromagnetic Diaphragm Metering Pump

    ‌RockySea Petro Electromagnetic Diaphragm Metering PumpFeatureThe Electromagnetic diaphragm metering pump of RockySea Petro has the following advantages.1. The flow can be adjusted by manually adjusting the stroke to change the flow and adjusting the stroke frequency.2. It is easy to install and equipped with filter bottom valve, injection valve and inlet and outlet hoses.3. The pump head and flow passage parts made of corresponding materials shall be configured according to the corrosion performance r

    VIEW DETAILS
  • PR2 Gate Valve
    PR2 Gate Valve

    ‌RockySea Petro PR2 Gate ValveFull support on your customised requirementThe strictest quality standards on PR2 gate valve25 years PR2 gate valve manufacturing experiencePR2 gate valves are designed for high performance wellheads and christmas tree in Oil or gas recovery wells, especially the gas wells that containing H2S or CO2 in high volume.Description The RockySea Petro PR2 valve is designed to suit severe oilfield conditions. It is mainly used in oil/gas wells with high performance requirements. S

    VIEW DETAILS

Diverter BOP

Date:2024-05-06 Popularity:805

RockySea Petro Diverter BOP


  • Using Auto CAD, Solid Works computer software to design drawings of Diverter BOP, using virtual prototype technology to simulate and verify strength.
  • RockySea Petro Petro adopted the principle of combining International Standard, National Standard and user’s view to design Diverter Blowout Preventers.
  • RockySea Petro Petro has passed ISO9001, ISO14001 certificate.
RockySea Petro Petro has strong Diverter BOP design ability. According to International standard and Chinese national standard GB/T 20174-2019, RockySea Petro Petro has designed and developed a series of Diverter Blowout Preventers according to market demand.


Description 

At the shoe, well integrity is often an issue with Diverter Blowout Preventer shallow casing strings and, in some cases, shutting in the well can cause too much pressure. Whenever a well with little/no shoe integrity is closed-in, this can cause formation fluids to broach to the surface or it can cause a shoe breakdown. When the shoe broaches, a bottom supported rig can be put into danger (along with its crew), including platform, jack-up, and land rig, but it won’t considered as dangerous for a floating vessel. When inadequate casing is present and a shallow gas kick is encountered in a bottom supported rig, diverting is the best alternative to shutting in. To allow time for remedial action and potential evacuation, and to reduce the risk of damage, the flow needs to be directed as the well begins to unload. When shallow gas potential is seen, a Diverter BOP system should be installed before penetrating the formation. By doing this, proven well control procedures can be used. This can only occur when formation integrity will allow for the well to be killed (through the application of back pressure and/or shutting in).


Features 

  • Only the piston and the tapered rubber core are moving parts, which effectively reduces the wear area and shortens the maintenance and repair time.
  • Use the tapered rubber core, the top cover and the shell are connected by claw blocks.
  • The design and development direction of the diverter is low-pressure drilling environment, and the structure is simple and reliable.


Data Sheet

ModelDiverter BOP
StandardInternational Standard
Nominal diameter(in)7 1/16 to 13 5/8
Rated working pressure(psi)Around 3000
Processing typeForging
MaterialAA to EE and optional
Metal temperature class-29~121℃
Nonmetal temp. class-18~121℃
Ring gasketR45 or optional
Dimension and WeightBased on specific type


RockySea Petro Copyright © 2008-2025 Inc. SITEMAP