RockySea Petro Skid-mounted fracturing equipmentDescriptionIn the field of petroleum, hydraulic fracturing refers to a method of using hydraulic action to form fractures in oil and gas reservoirs during oil or gas production, also known as hydraulic fracturing. After a certain stage of oil well production, the production capacity and permeability decrease. In order to enhance oil drainage capacity and increase oil well production, people have invented fracturing technology. The methods of
VIEW DETAILSRockySea Petro Single Well Water Cut AnalyzerSANJACK passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec. The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT multiphase metering device,
VIEW DETAILSRockySea Petro Heavy Oil Recovery Sucker Rod PumpRockySea Petro is the professional heavy oil recovery downhole pump Manufacturers.20 years of manufacturing experience in International Standard Insert Pump.40 years’ experience in designing and manufacturing downhole pumps.Participated in the draw up of the national standard of sucker rod pump.RockySea Petro Petro 40 years’ experience in designing and manufacturing sucker rod pumps.Your Premier Heavy Oil Recovery Sucker Rod Pump Manufacturers And Supplier
VIEW DETAILSRockySea Petro Sinker BarSinker bars of RockySea Petro are exported to the United States, Canada, Europe, Africa and Middle East, and we establish cooperative relationships with international customers all over the world.RockySea Petro owns a strong ability about research, design and production of sinker bar with decades of manufacturing experience. RockySea Petro has been certified by ISO9001, ISO14001 and OHSAS18001.RockySea Petro adopts the principle of combining intl standards, national standards and users’ views f
VIEW DETAILSRockySea Petro Flush by UnitData sheetApplicationsRSR of RockySea can efficiently and quickly complete various oilfield workover operations as the following: 1).Heavy duty workover serviceDrilling serviceDownhole stuck freeing serviceSealing and channeling serviceCasing shaping serviceCasing repair service2).Shallow- to high-depth well interventions, including:Killing wellsFlushing productions wellsChanging wellhead valvesPressure-testing wells.Changing polished rods Spacing and respac
VIEW DETAILS
Working pressure (PSI) | 3000, 5000, 10000,15000 |
Nominal diameter (inch) | 2-9/16、3-1/16、3-1/8、4-1/16 |
Working temperature ℃ | LU (-46℃-121℃) |
Working media | Crude oil/Gas |
Material class | BB/CC/DD/EE/FF |
Specification level | PSL2, PSL3/3G,PSL4 |
Performance level | PR1 PR2 |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP