RockySea Petro Frac Wellhead And Christmas TreeIn the process of oil recovery, multistage fracturing of horizontal wells is currently the most advanced technology in the world and represents the development direction of oil and gas production technology. Multistage fracturing technology is to strictly control the number, diameter, and phase of perforation in several or more horizontal sections with better reservoir along the horizontal wellbore, according to the physical properties and the character
VIEW DETAILSRockySea Petro Skid-mounted fracturing equipmentDescriptionIn the field of petroleum, hydraulic fracturing refers to a method of using hydraulic action to form fractures in oil and gas reservoirs during oil or gas production, also known as hydraulic fracturing. After a certain stage of oil well production, the production capacity and permeability decrease. In order to enhance oil drainage capacity and increase oil well production, people have invented fracturing technology. The methods of
VIEW DETAILSRockySea Petro Self-Tensioning Guy-Wire Workover RigFeaturesA workover rig with guy-line is a double drum workover rig that installs wind loaded guy-wires on the main engine.There is no need to install wind loaded guy-wires with ground anchors, which greatly improves the efficiency of workover operations, reduces operating costs and labor intensity.Also it has features as the following:(1) Suitable for small well site operations, reducing the operation area of the entire workover rig.(2) All te
VIEW DETAILSRockySea Petro Sinker BarSinker bars of RockySea Petro are exported to the United States, Canada, Europe, Africa and Middle East, and we establish cooperative relationships with international customers all over the world.RockySea Petro owns a strong ability about research, design and production of sinker bar with decades of manufacturing experience. RockySea Petro has been certified by ISO9001, ISO14001 and OHSAS18001.RockySea Petro adopts the principle of combining intl standards, national standards and users’ views f
VIEW DETAILSRockySea Petro Mobile Workover RigData sheetApplications1).Shallow - to high-depth well interventions, including:Killing wellsFlushing productions wellsChanging wellhead valvesPressure-testing wells.Changing polished rods Spacing and respacing rod strings2).Continuous rod and conventional sucker rod interventions,includingPulling and replacing casing serviceSidetrack serviceChanging insert of pcpChanging rotors of pcp,3).Heavy duty workover rig serviceDrilling serviceDownhole stuck freeing se
VIEW DETAILSModel | Nominal diameter (mm) | Stroke (m) | Tubing connection (in) | Sucker rod connection (in) | Pump constant (K) | Max. OD.(mm) |
25-175THQB
25-175THQBF | 44.5 | 1.8~9 | 2 7/8 | 3/4 | 2.235 |
89.5 |
25-200THQB
25-200THQBF | 50.8 | 2.919 | ||||
25-225THQB
25-225THQBF | 57.2 | 3.694 | ||||
30-250THQB
30-250THQBF | 63.5 | 3 1/2 | 7/8 | 4.560 |
108 | |
30-275THQB
30-275THQBF | 69.9 | 5.518 |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP