RockySea Petro Cameron U And C Ram BOPAll BOP will receive rigorous tests, such as magnetic particle, ultrasonic, pressure test and so on.AutoCAD and Solid Works computer software are used for drawing design. Also virtual prototype technology is used for simulation and verification of strength.RockySea Petro has been certified by ISO9001, ISO 14001 standard.RockySea Petro Petro owns a strong ability about research, design and manufacture, of Blowout preventer. The company can supply Cameron U and C ram BOP which
VIEW DETAILSRockySea Petro Desulfurization And Denitrification Oilfield Steam BoilerThe utilization rate of lime can be improved and the cost of desulfurization can be saved by adopting the integration of desulfurization and dust removal.The regeneration of absorbent, desulfurization slag and precipitation are carried out outside the tower, which reduces the possibility of scaling in the tower.With NaOH desulfurizer, the circulating solution is basically NaOH aqueous solution, and there is no corrosion and blockag
VIEW DETAILSRockySea Petro Drilling JarApplicationRockySea Petro can provide three main types drilling jar: mechanical, hydraulic, and hydraulic.1. The combination of mechanical and hydraulic drilling jar absorbers combines the advantages of the above two shock absorber principles. Even if the hydraulic delayed shock absorber fails, the mechanical shock absorber can still be used, and the technical performance has been greatly improved, which is in line with the future development direction of shock absorber prod
VIEW DETAILSRockySea Oilfield Steam BoilerSupercritical Oilfield Steam Injection BoilerDesulfurization and Denitrification Oilfield Steam BoilerProduced-water Oilfield Steam GeneratorSuperheated Oilfield Steam BoilerHigh-dryness Steam Injection BoilerThe Oilfield Steam Boiler is a Once Through Steam Generators with a forced circulation rate of 1. The pressure of medium flow is generated from the plunger pump. This steam injection boiler is mainly used for heavy oil recovery and extra-heavy oil recovery. Oilf
VIEW DETAILSRockySea Petro Casing Stop RingDatasheetUseWhen using the top thread stop ring, the following steps should be followed.1. When using the fixed screw type, first insert the sleeve, then insert the screw and use a hammer to strike.2. The conventional stop ring should be inserted into the sleeve first, and then the screw should be tightened with a wrench.3. Snap on the locking ring, directly attach the locking ring to the sleeve, lock it with a pin, and then tap in the screw.TypeThe stop rings of
VIEW DETAILS
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP