RockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILSRockySea Petro Mechanical Diaphragm Metering PumpDescriptionDiaphragm metering pumps use flexible diaphragms to replace pistons. Driven by the drive mechanism, the diaphragms move back and forth, changing the pump chamber volume, and absorbing and discharging liquids under the action of the pump inlet and outlet valves.Diaphragm metering pump can be used to transport corrosive and non-corrosive liquids without solid particles in a quantitative manner according to the needs of various process fl
VIEW DETAILSRockySea Petro Double Separation Weighting Multiphase Flow Meter DeviceRockySea Petro passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec.The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT mul
VIEW DETAILSRockySea Petro Pumping UnitRockySea Petro has 20 years of oil pump jack experienceAccording to the International Standard and GB/T29021-2012 《Beam Pumping Unit》standards.American Petroleum Institute member unit.the company has welding and machining workshop 17,942 square meters, take up 64,952 square meters, complete inspection and test equipment, and has more than 130 types of advanced production facilitiesRockySea Petro Petro has strong capacity of research, design and manufacturing pumping unit, the annual pr
VIEW DETAILSRockySea Petro Flush by UnitData sheetApplicationsRSR of RockySea can efficiently and quickly complete various oilfield workover operations as the following: 1).Heavy duty workover serviceDrilling serviceDownhole stuck freeing serviceSealing and channeling serviceCasing shaping serviceCasing repair service2).Shallow- to high-depth well interventions, including:Killing wellsFlushing productions wellsChanging wellhead valvesPressure-testing wells.Changing polished rods Spacing and respac
VIEW DETAILSOCTG Tubing Data Sheet from China RockySea Petro Petro Factory:
Type | Size(O.D. ) | Nominal Weight | W.T. | I.D. | Coupling | |||
in | Mm | Lbf/ft | Kg/m | mm | mm | O.D.mm | Min length mm | |
NUE
J55 L80 N80 P110 | 1.90 | 48.26 | 2.75 | 4.09 | 3.68 | 40.90 | 55.88 | 95.25 |
2 3/8 | 60.32 | 4.60 | 6.85 | 4.83 | 50.66 | 73.02 | 107.95 | |
2 7/8 | 73.02 | 6.40 | 9.52 | 5.51 | 62.00 | 88.90 | 130.18 | |
3 ½ | 88.90 | 9.20 | 13.69 | 6.45 | 76.00 | 107.95 | 142.88 | |
4 1/2 | 114.30 | 12.60 | 18.75 | 6.88 | 100.54 | 132.08 | 155.58 | |
EUE
J55 L80 N80 P110
| 1.90 | 48.26 | 2.90 | 4.32 | 3.68 | 40.90 | 63.50 | 98.42 |
2 3/8 | 60.32 | 4.70 | 6.99 | 4.83 | 50.66 | 77.80 | 123.82 | |
2 7/8 | 73.02 | 6.50 | 9.67 | 5.51 | 62.00 | 93.17 | 133.35 | |
3 ½ | 88.90 | 9.30 | 13.84 | 6.45 | 76.00 | 114.30 | 146.05 | |
4 1/2 | 114.30 | 12.75 | 18.97 | 6.88 | 100.54 | 141.30 | 158.75 |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP