RockySea Petro Casing Stop RingDatasheetUseWhen using the top thread stop ring, the following steps should be followed.1. When using the fixed screw type, first insert the sleeve, then insert the screw and use a hammer to strike.2. The conventional stop ring should be inserted into the sleeve first, and then the screw should be tightened with a wrench.3. Snap on the locking ring, directly attach the locking ring to the sleeve, lock it with a pin, and then tap in the screw.TypeThe stop rings of
VIEW DETAILSRockySea Petro Plunger Metering PumpApplication Data1. Hot residue in vacuum distillation (200 ℃, solid)2. Mix four items (resin, pigment and accelerator) in the production of plastic film3. Measurement of viscous bromine based catalyst in margarine production4. Adding glucose syrup in the candy industryFeatureRockySea plunger metering pump has the following advantages.1. The diameter of the plunger can be very small, generally D6-200mm.2. The flow is within the range of 10% - 100%, the meteri
VIEW DETAILSRockySea Petro Common Sucker RodRockySea Petro can supply common sucker rods and pony rods which comply with intl standard. These sucker rods also have various types to fit different environments and applications. They are manufactured through many processes including the testing, straightening and forging. Sucker rods of RockySea Petro are made of high quality carbon steel and alloy steeldue to customer request. Oursucker rods are exported to the United States, Canada, Europe, Africa and Middle East, and we esta
VIEW DETAILSRockySea Petro BOP Steam Injection And Oil Recovery Integration WellheadRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILSRockySea Petro Copyright © 2008-2025 Inc. SITEMAP