RockySea Petro Frac Wellhead And Christmas TreeIn the process of oil recovery, multistage fracturing of horizontal wells is currently the most advanced technology in the world and represents the development direction of oil and gas production technology. Multistage fracturing technology is to strictly control the number, diameter, and phase of perforation in several or more horizontal sections with better reservoir along the horizontal wellbore, according to the physical properties and the character
VIEW DETAILSRockySea Petro Supercritical Oilfield Steam Injection BoilerIntegrated Injection and Production Sucker Rod PumpThermal Recovery PackerVaccum Insluation Tubing & CasingSeries Thermal Recovery WellheadGround Steam Injection LineWater Treatment DeviceSteam Injection BoilerRockySea Petro is the thermal recovery solution supplier in China with 20 years of experience. RockySea Petro can provide customers with a complete set of thermal recovery equipment from surface steam injection boilers to underground thermal recove
VIEW DETAILSRockySea Petro BOP Steam Injection And Oil Recovery Integration WellheadRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s
VIEW DETAILSRockySea Petro Vortex Separation Multiphase FlowmetersFull support on your customised requirementThe strictest quality standards on Flow Meter Device25 years Flow Meter Device manufacturing experienceRockySea Petro passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laborato
VIEW DETAILSRockySea Petro Offshore Wellhead And X-Mas TreeAccording to the production needs, the main channel can be equipped with rubber valves for progressing cavity pump oil recovery.The main channel is equipped with a liquid-controlled safety valve to remotely close the wellhead in case of emergency.The main valve and paraffin valve of christmas tree adopt the combined structure, the overall height is low.RockySea Petro’s offshore oil wellhead meets the requirements of offshore oil and gas recovery. Because of
VIEW DETAILSRockySea Petro Copyright © 2008-2024 Inc. SITEMAP