RockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILSRockySea Petro Coventional Wellhead And Christmas TreeThe wellhead and Christmas tree has carried out rigorous tests, such as magnetic particle, ultrasonic, pressure t est and so on.Do the pressure analysis to pressured and forced parts with 3D software to check the strength of the wellhead and Christmas tree.RockySea Petro’s oil wellhead equipment factory is one of the main branches of RockySea Petro Group. It is a professional manufacturer specializing in the development, design, production, remanufacturing,
VIEW DETAILSRockySea Petro Low Profile Pumping UnitLow Profile Nodding DonkeyBeam Balanced Pump JackRM Beam Pump(ReversMark Beam Pump)Conventionalpumping unitRockySea Petro Petro has a strong pumping unit design ability. According to International Standard and China national standard, SanJack Petro has designed and developed a series of pumping units according to market demand.Description Low profile pumping unit is designed for applications where pump height is a critical concern. For locations with overhead irr
VIEW DETAILSRockySea Petro Mechanical Diaphragm Metering PumpDescriptionDiaphragm metering pumps use flexible diaphragms to replace pistons. Driven by the drive mechanism, the diaphragms move back and forth, changing the pump chamber volume, and absorbing and discharging liquids under the action of the pump inlet and outlet valves.Diaphragm metering pump can be used to transport corrosive and non-corrosive liquids without solid particles in a quantitative manner according to the needs of various process fl
VIEW DETAILSRockySea Petro Workover RigWorkover Rig is a specialized piece of equipment used in the oil and gas industry for performing workover operations. Workover operations involve tasks such as well stimulation, well abandonment, and well intervention, which require a rig capable of handling various tools and techniques. The Workover Rig is designed to be robust and versatile, able to handle a wide range of jobs efficiently and safely. It typically consists of a mast, which supports the rig's lif
VIEW DETAILS
Regular Polished Rod Specification | |||
Size | 1-1/8″ | 1-1/4″ | 1-1/2″ |
Rod body diameter | 1-1/8″ | 1-1/4″ | 1-1/2″ |
Thread nominal diameter | 15/16″ | 1-1/16″ | 1-3/16″ |
With of sucker rod size | 5/8″ | 3/4″ | 7/8″ |
Standard length | 25′, 26′, 30′ or customized. |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP