other
HOT PRODUCT
  • BOP Steam Injection And Oil Recovery Integration Wellhead
    BOP Steam Injection And Oil Recovery Integration Wellhead

    RockySea Petro BOP Steam Injection And Oil Recovery Integration WellheadRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s

    VIEW DETAILS
  • Single Well Water Cut Analyzer
    Single Well Water Cut Analyzer

    ‌RockySea Petro Single Well Water Cut AnalyzerSANJACK passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec. The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT multiphase metering device,

    VIEW DETAILS
  • OCTG Casing
    OCTG Casing

    RockySea Petro OCTG Casing: Quality and Reliability in OCTG PipeRockySea Petro Petro, a leading manufacturer of OCTG Casing based in China, operates a state-of-the-art factory dedicated to producing top-tier OCTG Casing. We are committed to delivering not only high-quality products but also competitive pricing to our customers worldwide. For a comprehensive quotation on OCTG Tubing and Casing, contact us today.Commitment to Excellence:ISO9001 Quality System: We adhere to the ISO9001 quality management sy

    VIEW DETAILS
  • Float Collar and Float Shoe
    Float Collar and Float Shoe

    ‌RockySea Petro Float Collar and FloatData sheetAdvantageRockySea has extensive experience in manufacturing float hoops and shoes, and its products have the following advantages.1) The reliable valve body structure reduces the resistance of cement slurry flow.2) All internal accessories are drillable and have the same diameter as the casing.3) The special structural design effectively prevents the backflow of cement slurry.4) The buckle can be processed into BTC/LTC/STC/VAM/FOX/TP-CQ/OTTM accordi

    VIEW DETAILS
  • Workover Rig
    Workover Rig

    ‌RockySea Petro Workover RigWorkover Rig is a specialized piece of equipment used in the oil and gas industry for performing workover operations. Workover operations involve tasks such as well stimulation, well abandonment, and well intervention, which require a rig capable of handling various tools and techniques. The Workover Rig is designed to be robust and versatile, able to handle a wide range of jobs efficiently and safely. It typically consists of a mast, which supports the rig's lif

    VIEW DETAILS

Produced-Water Oilfield Steam Generator

Date:2024-05-06 Popularity:461

RockySea Produced-Water Oilfield Steam Generator


  • Including high-dryness Oilfield steam generator, supercritical one-through steam generator, oilfield produced water oilfield heat boiler, all-polished rod oilfield steam injection boiler, desulfurization and denitrification steam injection boiler.
  • According to the different requirements of customers, energy-saving, ultra-high pressure and environmental protection boiler types are designed.
  • RockySea Petro has developed new series of mobile on-board and skid-mounted steam injection boilers with evaporation of 9.2~30t/h and working pressure of 17.2~26MPa.
RockySea Petro has been developing the leading product of oilfield steam injection boiler (wet steam generator) since 2011 and has acquired the qualification of Class A1 boiler manufacturing in 2012. At present, the annual production capacity is 50 sets.


Description

Produced water refers to the water produced with crude oil from oil wells. The produced water usually contains oil, salt, mechanical impurities, dissolved oxygen and saprophytic bacteria and so on, causing pollution to oilfields and the surrounding environment. After treatment, it can be refilled into the oil layer or used as the water source of the gas injection boiler. Water Treatment System According to customer requirements, SanJack adopts advanced water treatment technology and successfully develops Produced-water Oilfield Steam Boiler using produced-water as water source.



We have designed the air float oil removal unit to remove oil in produced water in the water treatment device of the oilfield produced-water boiler. Then replace the strong acid removal resin with weak acid resin and increase the treatment stage to eliminate hardness; afterward, the qualified boiler for produced water treatment is supplied with water through ultrafiltration and reverse osmosis.



Produced Water Treatment Equipment

With Independent Intellectual Property Tights



Water Quality Comparison of Produced Water Steam Injection Boiler



The comparison between the above two tables shows that the requirement for raw water is greatly relaxed by produced water treatment. Except for PH value, each index is relaxed 4 times to 2000 times. More than 60% of produced water produced in oil field is within the scope of treatment and reuse. Through design improvement of boiler, the index for steam injection water production is also slightly relaxed under the premise of ensuring safe operation of boiler.

Steam Injection Boiler System

Produced Water Steam Injection Boiler mainly add suspended matter separation device, energy recovery system and convection section monitoring system. By checking the temperature changes, judge the scaling condition of furnace pipe and eliminate the hazards in time. Improve boiler’s suitability for produced water:

  • Centralize condensate in flushable and replaceable parts. Sedimentation is suitable for produced water operation.
  • Increase inlet water temperature and exceed dew point temperature of flue gas, so as to avoid condensation of water vapor in flue gas on finned tube in convection section and cause low temperature corrosion of pipe;
  • Separate suspended matter generated with high temperature, avoid corrosion and scouring under scale, and increase heat recovery;


Produced-water Oilfield Steam Generator Parameter

1). Rated evaporation:          15t/h 
2). Rated working pressure:  21MPa 
3). Steam temperature:         370 C 
4). Rated steam dryness:       >85% 
5). Thermal efficiency:           >90%) 
6). Combustion mode:          dual use of oil and gas 
7). Control Mode:                  PLC+Touch Screen+Industrial Computer 
8). Loading mode:                 Skid-mounted and on-board

Water Treatment System Parameter

1). Oil content:      <2mg/L 
2). Turbidity:          <5mg/L 
3). Hardness:         <0.1mg/L 
4). Mineralization: <4000mg/L 
5). Fe2+:                <0.5mg/L 
6). PH:                     7.5~9


RockySea Petro Copyright © 2008-2025 Inc. SITEMAP