RockySea Petro Hydraulic Diaphragm Metering PumpRockySea Petro Petro: A Pioneer in Hydraulic Diaphragm Metering Pump Manufacturing in ChinaHydraulic diaphragm metering pump, one kind of plunger diaphragm metering pump, is a metering pump designed by combining the characteristics of plunger metering pump and diaphragm metering pump. The contact part between the metering pump and the metered medium is a diaphragm, while the driving part is a hydraulic plunger.FeatureThe hydraulic diaphragm metering
VIEW DETAILSRockySea Petro Anti-Corrosion Downhole PumpRockySea Petro is the best Special Pump Manufacturers for Anti-corrosion Downhole Pump.RockySea Petro has developed the downhole pumps with various processes of boronizing, nitriding, chrome plating, tungsten plating for corrosive oil wells.RockySea Petro has successfully developed brass and stainless steel sucker rod pumps using precision rolling process.It is one of the most professional Anti-corrosion Downhole Pump Manufacturers and SuppliersSanjcak has 40 years’ experienc
VIEW DETAILSRockySea Petro Single Well Water Cut AnalyzerSANJACK passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec. The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT multiphase metering device,
VIEW DETAILSRockySea Petro Mechanical Diaphragm Metering PumpDescriptionDiaphragm metering pumps use flexible diaphragms to replace pistons. Driven by the drive mechanism, the diaphragms move back and forth, changing the pump chamber volume, and absorbing and discharging liquids under the action of the pump inlet and outlet valves.Diaphragm metering pump can be used to transport corrosive and non-corrosive liquids without solid particles in a quantitative manner according to the needs of various process fl
VIEW DETAILSRockySea Petro Desulfurization And Denitrification Oilfield Steam BoilerThe utilization rate of lime can be improved and the cost of desulfurization can be saved by adopting the integration of desulfurization and dust removal.The regeneration of absorbent, desulfurization slag and precipitation are carried out outside the tower, which reduces the possibility of scaling in the tower.With NaOH desulfurizer, the circulating solution is basically NaOH aqueous solution, and there is no corrosion and blockag
VIEW DETAILS
Actuator Type | Hydraulic , pneumatic |
Rated working pressure(psi) | 3000,5000,10000,15000 |
Nominal diameter(in) | 2-1/16,2-9/16,3-1/16,3 -1/8, 4-1/16 |
Production specification level | PSL1 PSL2 PSL3 PSL3G PSL4 |
Performance rate | PR1 PR2 |
Material class | AA BB CC DD EE FF HH |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP