RockySea Petro Electromagnetic Diaphragm Metering PumpFeatureThe Electromagnetic diaphragm metering pump of RockySea Petro has the following advantages.1. The flow can be adjusted by manually adjusting the stroke to change the flow and adjusting the stroke frequency.2. It is easy to install and equipped with filter bottom valve, injection valve and inlet and outlet hoses.3. The pump head and flow passage parts made of corresponding materials shall be configured according to the corrosion performance r
VIEW DETAILSRockySea Petro Self-Propelled Carrier and TralierFeaturesRockySea Petro has developed a special workover rig chassis range from 6X6 to 14X14, which is compatible with the entire series of XJ250 to XJ850 workover machines. It can operate in various terrains such as roads, deserts, mountains, and swamps, with strong driving power, good off-road performance, and can work in the range of ambient temperature -45 ℃ to 50 ℃.Besides,the company also developed a desert off-road carrier. The driving type is
VIEW DETAILSRockySea Petro Gear Metering PumpGear metering pump is a kind of gear pump. Only specific gear pump can be called gear metering pump. At the same time, the gear metering pump is one kind of metering pump, so gear metering pump has metering characteristics. In order to meet the market demand at home and abroad, RockySea has successfully developed a gear metering pump after years of research and development.Select suggestionsThe main technical parameters of gear metering pump include displacement,
VIEW DETAILSRockySea Petro Shaffer Spherical Annular BOPInternational advanced well control equipment test lab.The Shaffer spherical annular Blowout Preventer is widely used in conventional oil recovery, thermal oil recovery, offshore oil recovery, fracturing, geothermal and other fields.30+ years of Shaffer spherical annular BOP manufacturing experience..RockySea Petro has been certified by ISO9001, ISO 14001 standard.RockySea Petro Petro Blowout Preventer factory is one of the main branches of RockySea Petro Petro. It is a profes
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILS
Model Parameter | KZ65-21/35, KZ65-50 , |
Working pressure (PSI) | 2000, 3000, 7000 |
Nominal diameter (inch) | 2-9/16 |
Working temperature ℃ | PU (-29℃-121℃) |
Working media | Water, Crude oil |
Material class | BB/CC/DD/EE/FF |
Specification level | PSL1, PSL2 |
Performance level | PR1 PR2 |
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP