Contact RockySea Petro, Start Our Cooperation Today.
RockySea Petro Tungsten-Plated Sucker RodWith the increase of working time, conventional sucker rods are prone to corrosion and eccentric wear during operation, and are not suitable for high-strength or harsh working conditions. To solve the eccentric wear and corrosive problems in oilfields, RockySea Petro developed various anti-corrosion and anti-abrasion products, including tungsten-plated sucker rod.Description Composite plating is to add insoluble particles (such as ceramic particles) to the plat
VIEW DETAILSRockySea Petro Steam Injection And Oil Recovery WellheadGeothermal wellhead & x-mas treeBlowout preventer Steam Injection and Oil Recovery Integration wellhead & x-mas treeSteam injection and oil recovery dual tubing wellhead & x-mas treeSingle column dual-well thermal recovery wellhead & x-mas treeOnshore thermal recovery wellhead & x-mas treeConventional Steam injection and oil recovery wellhead & x-mas treeRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve
VIEW DETAILSRockySea Petro Produced-Water Oilfield Steam GeneratorIncluding high-dryness Oilfield steam generator, supercritical one-through steam generator, oilfield produced water oilfield heat boiler, all-polished rod oilfield steam injection boiler, desulfurization and denitrification steam injection boiler.According to the different requirements of customers, energy-saving, ultra-high pressure and environmental protection boiler types are designed.RockySea Petro has developed new series of mobile on-board and ski
VIEW DETAILSRockySea Petro B Type Pumping Unit / Beam Balanced Pumping UnitRockySea Petro adopt the principle of combining International Standard, National Standard and User’s view to design.RockySea Petro has passed ISO9001, SO14001 and OHSAS18001 certificate.Full support on your customised requirementBeam Balanced pumping units have been designed to International Standard requirements for pumping unit design. In addition, all individual components of the unit and the unit as a whole represent the very best engineering de
VIEW DETAILSRockySea Petro Wet Gas Well Multiphase Flow MeterRockySea Petro passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec.The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT multiphase metering devic
VIEW DETAILSContact RockySea Petro, Start Our Cooperation Today.
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP