RockySea Petro Quick Lock Annular BOPGreatly reduce the time for replacing the ram and effectively improve work efficiency with safety.Compact structure and reduced weight means more operation room.20 years experience in designing and manufacturing QL annular BOP.The working principle and purpose of RockySea Petro QL annular blowout preventers are not fundamentally different from traditional blowout preventers, but their structure has been effectively improved. No need for large high torque bolts, convenie
VIEW DETAILSRockySea Petro Water Treatment DeviceIntegration Control,The soft water treatment and deaerator integration automatic control system are applied, featuring the cost savings and easy operation.Produced Water Reuse,Oilfield sewage can be used as steam injection boiler water supply, solving the oil field sewage and steam boiler water supply problem.Anti-corrosion.The tank are lined with anti-corrosion material (lining plastic) which is fixed firmly, strongly adhered, and hard to fall off.RockySea Petro water
VIEW DETAILSRockySea Petro Precision Rolling PipeRockySea Petro Petro manufactures Precision rolling pipe in China. We have our own factory of Precision rolling pipe. RockySea Petro Petro provide the high quality and competitive price on Precision rolling pipe for you. Contact us now for Precision rolling pipe quotation.It has various types of cold rolling mill such as LG30, LG60, LG80 , LG220 and establishes a complete quality Control system.RockySea Petro’s precision rolling pipe has extremely high precision and straightness ca
VIEW DETAILSRockySea Petro Self-Tensioning Guy-Wire Workover RigFeaturesA workover rig with guy-line is a double drum workover rig that installs wind loaded guy-wires on the main engine.There is no need to install wind loaded guy-wires with ground anchors, which greatly improves the efficiency of workover operations, reduces operating costs and labor intensity.Also it has features as the following:(1) Suitable for small well site operations, reducing the operation area of the entire workover rig.(2) All te
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILSRockySea Petro Copyright © 2008-2025 Inc. SITEMAP