RockySea Petro Cameron U And C Ram BOPAll BOP will receive rigorous tests, such as magnetic particle, ultrasonic, pressure test and so on.AutoCAD and Solid Works computer software are used for drawing design. Also virtual prototype technology is used for simulation and verification of strength.RockySea Petro has been certified by ISO9001, ISO 14001 standard.RockySea Petro Petro owns a strong ability about research, design and manufacture, of Blowout preventer. The company can supply Cameron U and C ram BOP which
VIEW DETAILSRockySea Petro Packing Seal And Spare PartThe Packing seal and spare part is widely used in conventional oil recovery, thermal oil recovery, offshore oil recovery, fracturing, geothermal and other fields..30+ years of Packing seal and spare part manufacturing experience.International advanced well control equipment test lab.RockySea Petro Petro developed a series of rubber sealing products that are compatible with the blowout preventer series products. RockySea Petro can supply different specifications and models
VIEW DETAILSRockySea Petro Coated Sucker RodWith the increase of working time, conventional sucker rods are prone to corrosion and eccentric wear during operation, and are not suitable for harsh working conditions. In 2012, RockySea Petro developed a fully coated sucker rod. By using HDPE resin to fully coat the sucker rod body, the anti-corrosion and anti-abrasion of the sucker rod is realized. And this tech of RockySea Petro has gained patent in China, Canada and the United States.Description It is the ideal matching
VIEW DETAILSRockySea Petro Intelligent Pumping UnitsSuppliers and Manufacturers of The intelligent pumping units.Intelligent pumping unit Manufacturer in China.The intelligent pumping unit is equipped with data acquisition equipment, which can real-time collect the key data such as load, displacement, current, voltage, angular displacement, etc., and support the remote transmission of data to the application end, so as to realize the intelligent control of the pumping jack.DescriptionThe intelligent pumping uni
VIEW DETAILSRockySea Petro Single Column Dual-Well Thermal Recovery WellheadRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s ther
VIEW DETAILSConverting a flowing oil or gas well into one that utilizes a mechanical pumping configuration is a complex process that requires careful consideration of various factors. The choice of wellhead and X-tree models is a critical decision that impacts the efficiency, safety, and longevity of well operations.
Several factors must be taken into account when selecting the appropriate wellhead and X-tree model:
Understanding the well's condition in terms of pressure, temperature, and aggressiveness is essential. These factors will influence the choice of material, temperature class, and pressure class of the wellhead and Christmas tree.
Identifying the purpose for which the wellhead and Christmas tree model will be used is the first step. This purpose dictates the specific features and capabilities required for the equipment.
The type of production activity, whether onshore or offshore, will also guide the selection. Onshore oil and gas production requires equipment designed for land operations, while offshore wells may necessitate subsea or surface wellhead configurations.
If an Electrical Submersible Pump (ESP) is to be used, the wellhead and X-tree must accommodate the ESP components, including surface control, power cable, seal-chamber section, motor, and pump.
The size of various wellhead and X-tree parts, such as surface casing, hung casing, and hung tubing, is crucial for determining the appropriate model.
When choosing wellhead and X-tree models, consider the following components:
Ensure the polished rod is appropriately sized to prevent issues when working on challenging wells and to allow for full servicing without complications.
These clamps are essential for reinforcing the rod string during transportation and preventing spills by ensuring the rod string does not travel into the stuffing box.
Maintenance of check valves is critical to prevent oil or gas from escaping and flowing back into the wellbore, which can lead to operational inefficiencies.
Selecting the model of wellhead and X-tree is a multifaceted decision that requires a thorough understanding of the well's conditions, the intended use of the equipment, and the specific components involved in the operation. While this article provides a starting point, consulting with experts and referring to detailed industry standards and guidelines is recommended for making an informed choice.
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP